Back Office · office.temerarii.xyz
One asset, all the way in — composition, the wireframe + storyboard, the output format stack, and the template, all read from the SAME content-index record. The expected output matches what /media surfaces for this post.
post thread-field-notes-W52-Satkind threadweek W52date 2027-01-02campaign thread · Satpillar socialbeat Satasset videoduration 28.0sground redscenes 5

Checklist the per-video bar — engine/sim

80.9/100
plain languagevo coverageno dead airuniquenesscaption fitcompletenesscleanliness
quantitative quality · weights learn from your reviews (engine.sim.memory review thread-field-notes-W52-Sat good|bad)
⚠ 6 flag(s) — not yet ship-ready: copy_genericlow_vo_coveragedead_airgeneric_scene · see docs/strategy/VIDEO-CHECKLIST.md

Composition comp · template family · expected output

composition SceneReelfamily / template ListCard
9:16 Reelrendered1:1 Squarepending16:9 Widepending9:16 4Kpending1:1 4Kpending16:9 4KpendingGIF (SMS)pending
▶ open rendered mp4
expected output: 1/7 rendered — same matrix the /media preview surfaces for this asset.

Composition layer × scene 5 scenes · 28.0s · comp_id + rendered still + tier + the script

#Layer (comp_id · still · tier)BeatTimecodeMotionLogoAudioVO / on-screen / caption
1s1
matches intent
shared field
signature-3d
hook0–7.2skinetic-buildicon·liquid-chrome♪ node_lock
Field note. Every Friday someone hand-builds the same status report and quietly resents it. Let the machine write it.
on-screen: The report nobody wants
expected on screen: red ground · torus hero in the shared Signal Field · Nuntius leads · mark · kinetic-build · icon·liquid-chrome logo · caption bottom-left
spec (the prompt): comp_id shared Signal Fieldvisual markshape torusground redtreatment liquid-chromemotion kinetic-buildpower laser-lockinstrument laser-trace→The report nobody wants
2s2
matches intent
ChecklistCard
template
teach7.2–13.0skinetic-buildicon·white-knockout♪ node_lock
Old chore: open every dashboard, copy the numbers, paste them into a doc, every week.
on-screen: Pull, summarize, send, weekly
expected on screen: red ground · a ChecklistCard panel over a dimmed Signal Field · Nuntius leads · node-graph · kinetic-build · icon·white-knockout logo · caption bottom-left
spec (the prompt): comp_id ChecklistCardvisual node-graphshape torusground redtreatment white-knockoutmotion kinetic-buildpower morphinstrument morph+laser→Pull, summarize, send, weeklycurate items, nodes
3s3
matches intent
BuildLog
template
diff13.0–18.0scrossfade-8ficon·liquid-chrome♪ node_lock
Find the report you dread most and hand its pieces to a model on a schedule.
on-screen: Automate one Friday ritual
expected on screen: red ground · a BuildLog panel over a dimmed Signal Field · Nuntius leads · code · crossfade-8f · icon·liquid-chrome logo · caption bottom-left
spec (the prompt): comp_id BuildLogvisual codeshape torusground redtreatment liquid-chromemotion crossfade-8fpower morphinstrument morph→Automate one Friday ritualcurate codeLines, lines
4s4
first render · fix pending
NodeGraphCard
templatedead_airgeneric_scene
proof18.0–23.0sreceipts-counticon·white-knockout♪ node_lock
Field Notes
expected on screen: red ground · a NodeGraphCard panel over a dimmed Signal Field · Nuntius leads · receipts · receipts-count · icon·white-knockout logo · caption bottom-left
spec (the prompt): comp_id NodeGraphCardvisual receiptsshape torusground redtreatment white-knockoutmotion receipts-countpower receiptsinstrument spotlight→Field Notescurate hub, nodes, statsLabels
5s5
first render · fix pending
shared field
signature-3ddead_airgeneric_scene
resolve23.0–28.0scoalescenceicon·liquid-chrome♪ bed_out
Field Notes
expected on screen: red ground · torus hero in the shared Signal Field · Nuntius leads · coalescence · coalescence · icon·liquid-chrome logo · caption bottom-left
spec (the prompt): comp_id shared Signal Fieldvisual coalescenceshape torusground redtreatment liquid-chromemotion coalescencepower coalescenceinstrument coalescence→Field Notes

Format stack 3 aspects · same scenes[], re-cropped

9:16
1080×1920
Stories · TikTok · YouTube Shorts · Reels
1:1
1080×1080
LinkedIn · Facebook · Instagram
16:9
1920×1080
X/Twitter · YouTube · LinkedIn video

Channels 9 destinations

LinkedInX/TwitterYouTubeInstagramFacebookThreadsTikTokPinterestBluesky

Social captions supplemental published copy · per channel (comp_id level)

tiktokField note: every Friday someone hand-builds the same status report and quietly resents it. Open every dashboard, copy the numbers, paste them into a doc. Hand its pieces to a model on a schedule instead. (AI-assisted)
instagramThe report nobody wants to write. Every Friday: open dashboards, copy numbers, paste into a doc. Let the machine write it. Hand the pieces to a model on a schedule. #fieldnotes #automation #aitools #buildinpublic #worksmarter
linkedinField note. Every Friday, someone hand-builds the same status report and quietly resents it. The old chore: open every dashboard, copy the numbers, paste them into a doc, every single week. It is repetitive, it is error-prone, and nobody wants the job. The move: find the report you dread most and hand its pieces to a model on a schedule. Pick one Friday ritual and automate it this week.
xField note: every Friday someone hand-builds the same status report and resents it. Open dashboards, copy numbers, paste into a doc. Hand the pieces to a model on a schedule. temerarii.xyz
facebookField note: every Friday, someone hand-builds the same status report and quietly resents it. The old chore is open every dashboard, copy the numbers, paste them into a doc, every week. Find the report you dread most and hand its pieces to a model on a schedule instead.
threadsField note: every Friday someone hand-builds the same status report and quietly resents it. Open every dashboard, copy the numbers, paste them into a doc, every week. Find the report you dread most and hand its pieces to a model on a schedule.
pinterestHow to automate the weekly status report nobody wants to write: instead of opening every dashboard, copying numbers, and pasting them into a doc every Friday, hand the pieces to a model on a schedule. A simple field note on picking one dreaded ritual and letting the machine handle it.
blueskyField note: every Friday someone hand-builds the same status report and resents it. Open dashboards, copy numbers, paste into a doc. Hand the pieces to a model on a schedule.
youtubeTitle: Automate the Friday Report Nobody Wants to Write Field note. Every Friday, someone hand-builds the same status report and quietly resents it. The old chore: open every dashboard, copy the numbers, paste them into a doc, every single week. The move is to find the report you dread most and hand its pieces to a model on a schedule. Pick one Friday ritual and automate it this week. (AI-assisted)

Cross-links every lens is a view on this one record