Q3 ·
▶ Open the Q3 deck (MARP)SCALE THE PROOF — range (hub) → results (case studies) → the full engine + the Academy
Prove range (Hub launch) → prove results (Case studies) → open the always-on education engine
the outbound engine (Clay+signals, full) + the 8 pillars + the Academy (Fall)
104 (13 cells + 91 threads)
Compliance-exposed (SIE push W31–33) + broken-attribution (Performance W38–39)
SIE Compliance push (W31–33) · Performance (W38–39) · Neutral-builder (Hub W27–29 + workshops)
Case studies → Convert (book a first-outcome call); SIE plays → SIE demo/declared-intent; always-on → Capture (nurture). CTA → destination → UTM → funnel stage on every asset